- Does it apply? Match catalogue number, hardware revision, firmware and stated conditions against the installed configuration. Record missing information. A list that says “PLC” or “HMI” will rarely settle the question.
- What are the local consequences? Which function uses the device? How is it reached in normal operation? What happens to the process if availability or data integrity is lost? A severity score such as CVSS cannot account for the layout and production commitments of your site.
- What action fits? Check supported versions, dependencies, backups, test arrangements and the ability to return to a known state. If the update must wait, define an interim measure such as narrower access. Assign an owner, check effectiveness and set a review date.
When support has ended
Management needs to understand both the present exposure and its options if conditions change. A bounded network, controlled maintenance access and prepared spares may buy time. Their value depends on which path they actually control and whether the plant can recover. Where that remains uncertain, replacement belongs in the investment plan.
Keep the advisory reference, affected machines, reasoning, decision, owner and review date together. A published vulnerability, an incident at the plant and a reportable event each require their own assessment.